Beginning from today, 25th January 2023 onwards, the traffic would be changed in Ayanavaram in Chennai. This would be due to the metro rail construction works there.
Metro rail works have been going on at Anderson Road in Ayanavaram and due to that from 25th January for 7 days there would be traffic changes that would be carried out on a trial basis. Information is that Anderson Road in Ayanavaram would be closed for the metro rail works. Traffic would be allowed one way only on the Pilkington Road from Konnur High Road till Constable Road Junction.
Point to be noted is that all the traffic on these routes have been diverted and no permission is given to go from Konnur High Road to Perambur via Pilkington Road.
The vehicles after going straight on the Konnur High Road would have to take a left turn and then take Tank Bund Road. This was announced by the transport department.