Due to maintenance-related activities, certain changes have been made to the Chennai Metro City suburban electric train services.
The train operating from Moore Market-Pattabhiram Military at 10.15 PM and the train operating between Pattabhiram Military-Avadi starting at 11.55 PM have both been cancelled.
The train operated between Pattabhiram Military-Chennai Central at 10.45 PM and the train operating between Avadi-Central at 11.30 PM are both cancelled in part.
The train operating between Gummidippundi-Central starting at 4.50 AM will be partly cancelled in the section from Basin Bridge-Central.
Similarly, the train operating between Central and Gummidippundi starting at 6.25 AM is cancelled for the section from Central-Basin Bridge.
The suburban electric train operating between Sulurpettai-Central starting at 5.00 AM is cancelled in the section from Basin Bridge to Central.
The train operating between Central-Sulurpettai starting at 7.30 AM is cancelled for the section from Central-Basin Bridge.
The train operating between Sulurpettai-Central starting at 9.45 PM is cancelled for the section from Korukkuppetaai-Central.
The train operating between Chennai Central and Thiruvallur starting at 11.15 PM will operate from Chennai Beach at 11.00 PM.
The train operating from Central-Avadi at 11.45 PM will operate from Chennai Beach starting at 11.40 PM.
The train operating between Central-Avadi starting at 12.15 AM will start from Chennai Beach at 12.20 AM.
It has been announced that the above changes will be in effect from today (Saturday, 1st April) until 25th April.