CMRL was recently awarded as ‘Imminent Metro Rail Operator ‘ at the third Annual Metro Rail Summit 2014 structured by ITP publishing group in Gurgaon, Delhi.
36 km of tunnelling was planned for the Metro Rail Project. 12 Tunnel boring machines were procured. 900 metres to 1000 metres tunnelling work is completed in a month.
The first metro train manufactured at Tada, Andhra Pradesh was officially handed over to the Metro Rail Corporation Director, Mr. Pankajkumar Bansal on Thursday, 27th February.