In the near future, passengers coming out of the metro stations in Chennai would be able book a ride in cabs or in electric autos at cheap rates and could reach their places of destination.
For constructing the 7.85km elevated line of Chennai Metro phase-2 corridor-4 from Porur junction to Poonamallee Bypass, CMRL has received bids from 3 major construction firms now.