Department of Railways is devising plans to make available 12 metro rails between Koyambedu and Alandur, as a heavy population of commuters is expected in this route.
The 2nd phase of analytical checking of the performance of the Metro Rail section Koyambedu-Alandur is scheduled to be carried out during the end of this month.
Tunnelling work for CMRL is over
...........................................................................................................................
Action is being taken to operate Metro Rail in two corridors covering 45 kilometres.
Minister of Urban Development Shri M.Venkaiah Naidu expressed concern over delays in according safety clearences for Metro Rail projects resulting in non-utilisation of such projects built with substantial investments.
The first stage of the security checks of the track testing of the Metro Rail Project in the Koyambedu – Alandur section has started today, Monday, 5th April.
Highlight features of Metro Rail!
...........................................................................................................................
Metro Rails are being run in 178 cities all over the world including India.
Safety check of Metro Rail postponed
...........................................................................................................................
Commissioner of Metro Rail Safety (CMRS) was supposed to begin the inspection of Chennai Metro Rail’s 10-km stretch between Koyambedu and Alandur on March 20th.