Power supply will be suspended in the following areas on Friday (22.11.2024) from 09.00 am to 02.00 pm for maintenance work.
Perumbakkam, Medavakkam and Pallikkaranai: Kailash Nagar, Antony Nagar, Krishna Nagar, Radha Nagar, Sowmya Nagar, Mambakkam Main Road, Gandhi Nagar, Nookanpalayam Road (one portion), Cheran Nagar, Babu Nagar, CBI Colony, Velachery Main Road, Ponniamman Koil Street, Pillayar Koil Street, Bajanai Koil Street, Ex-Serviceman Colony, Pallavan Nagar, LR Avenue, Munusamy Nagar, Medavakkam Main Road, Ranganathapuram, Pattel Road, Prince College, Sivagami Nagar, Saraswathi Nagar, Nallathambi Nagar, Erikarai Road, Vimala Nagar, Meenatchi Nagar, Rajalakshmi Nagar, Sai Ganesh Nagar, Sai Balaji Nagar, Raja Nagar, RS Nagar, Chadagopan Nagar, Part of Jalladampet, Krishna Nagar, Dharmalingam Nagar, Viveganandha Nagar, Vallal Pari Nagar, Ganapathipuram.
Flower Bazaar, Park Town, Esplanade and Mannady: Rattan Bazaar, NSC Bose Road, Frazier Bridge Road, Evening Bazaar, Devaraja Mudali Street (one part), Mint Street (one part) Nainiyappa Naicken Street, Genguram Street, Raghu Naickulu Street, Pethu Naicken Street, EVR Salai, Issac Street, Parmasivam Street, Vengu Street, Mannar Street , Perara Street, Kuladai Street, Wall Tax Road, Ponnappa Street, Rasappa Street, Subbu Street, Kallapp Street, Ammon Koil Street, Pillaiyar Koil Street, Samudura Street, EK Agraharam Street, NSC Bose Road, Badriyan Street, Stringer Street, Maliyaperumal Street, Broadway, Anderson Street, Buder Street Sembudoos Street, Goomes Street, Francis Street, Suguvar Agraharam Street, Macklin Street, Periyanna Street.
Tirumullaivoyal: Morai, Morai Industries, Vel Tech Main Road, Sheela Nagar, Vijayalakshmi Nagar, Srinivasa Nagar, Sapthagiri Nagar, Barkavi Nagar.
Enjambakkam: Akkarai Metro Water, Mantri Villa, Prestige Silver Spring Villa, MGR Nagar, KK Salai, Spring Garden, Sea Cliff, Copper Beach, Sunrise Avenue, LG Avenue, Sparkling Sand Avenue.
Gummidipoondi: Entire Gummidipoondi Bazaar (GNT Road) upto Pethikuppam Railway Bridge, Balakrishnapuram, MaPoSi Nagar, Verkadu, Rettambedu Main Road, Aathupaakam, Enathimelpaakam, Soliambaakam, Thervazhi, Thambureddy Palayam, Appavaram, Mangavaram and Kuriviagaram villages.
Supply will be resumed before 02.00 P.M, if the works are completed.