Kumari Palany & Co

Power Generation in NLC affected

Posted on: 17/Nov/2015 4:58:02 PM
As the mines are inundated with stagnant water and also the activity of loading the coal on the conveyor system is stopped, power generation in Neyveli Lignite Corporation is affected.

Generally, NLC 1st Unit generates MW. However, since mining of coal has been stopped, not even a single unit could be generated.