Kumari Palany & Co

Motorists can use EVR Salai as two way from today

Posted on: 06/Aug/2017 11:50:55 AM
In view of CMRL work in the stretch of EVR Salai between Gengu Reddy Sub Way junction and Ega junction one way implementation was made in the following roads.
  • EVR Salai
  • Mayor Ramanathan Road (East)
  • Mayor Ramanathan Road
  • Dr.Gurusamy Road
  • Gengu Reddy Sub Way
As the CMRL work is nearing completion, it is proposed to implement two way traffic systems in EVR Salai with effect from 06.08.2017. Two way traffic is allowed from Gengu reddy subway to Ega in EVR Salai, Mayor Rmanathan Road, Gengu reddy subway and Gurusamy bridge with following modification:

1. Entry of vehicles from Gengu Reddy Sub Way Junction towards Ega is allowed. Vehicles coming from Gengu Reddy Sub Way towards Dasaprakash is allowed between 16.00 hours to 07.00 hours. In the remaining hours i.e 07.30 hrs to 16.00 hrs, right turn is not allowed towards Dasaprakash. Those vehicles have to take Right in Spurtank Road x P.T School junction itself and reach their destination via Egmore High Road, Udippi Point and Nair Bridge. Vehicles reaching Gengu Reddy Sub Way x EVR Salai junction have to take U turn at Burnaby Junction to reach their destination.

2. At Flowers Road junctions Vehicles cannot take right turn to reach Ega Junction. Those vehicles have to take U Turn at Gengu Reddy Sub way junction to reach Ega.

3. Vehicle coming from Gengu Reddy Sub Way junction intended to reach Vasu Street cannot take right turn at Ega junction. Those vehicles should reach Tailors Road and take U turn to reach their destination.

4. Right turn is not allowed for the vehicles coming from Tailors Road towards Aminjikarai except the School hours between 07.30 hrs to 08.30 hrs and 14.30 hrs to 15.30 hrs. Those vehicles should reach Ega junction, take U turn to reach their destination.

5. In continuation of implementation of two way traffic in Spurtank Road, Vehicles coming from Egmore High Road towards Gengu reddy subway cannot take right turn at P.T School junction. Those vehicles should take ‘U’ turn at Casa major Road & Spurtank Road junction to reach their designation.

6. Vehicles coming from EVR Salai via Gurusamy Bridge reaching Chetpet junction cannot take right turn towards Harrington Road. Those vehicles should take ‘U’ turn at Sterling point to reach Harrington Road.

7. Vehicles coming from Sterling Point intended to reach Spurtank Road cannot take right turn at Chetpet junction. Those vehicles have to use service road via Kusalambal Kalyana Mandapam to reach their destination.

8. Vehicles reaching Chetpet junction via Harington Road can go Straight, take left and right turn to reach their destination.

9. Straight, left and right turn is provided for the vehicles coming from Spurtank Road towards Chetpet signal.

10. Pedestrian crossing is provided in EVR Salai in front of Police Housing Corporation.