Power supply will be suspended in the following areas on 05-12-18 between 9.00 A.M. to 4.00 P.M. for maintenance work. Supply will be resumed before 5.00 P.M. if the works are completed.
Gummidipoondi Sipcot – I to IV: Gummidipoondi Sipcot SS I – IV Industrial Complex Area, Gummidipoondi Bazaar, New Gummidipoondi, Bypass Road, Rettembedu, Rajapalayam, Perianatham, Appavaram, Ayanallur, S R Kandigai, Papamkuppam, Chitrarajakandigai, Kannanbakkam, Kondamanalore, Equarpalayam, Arambakkam, Nemalure, Budur, Part of Poovalambedu, G R Kandigai, Elavoor, Pethilkuppam Village, Sunnambukulam.
Durainallur: Arani, Elavambedu, Puduvoyal, Panjetty, Kavarapettai, Chinnambedu and Durainallur.
Ponneri: Arasur, Eliambedu, Annuppambattu, A.R. Palayam, Aladu, Venbakkkam and Ponneri.
Medur: Medur, Kollur, Arasur and Annamalaicherry.
Devambedu: Devambedu, Kallore and Seganiyum.
Kavarapettai: Thandalacnerry and Panapakkam.
Irulipattu: Alinijivakkam, Athipattu, Irulipattu, P P Road and Saikiruba Nagar.