Kumari Palany & Co

Changeover in electric train services

Posted on: 12/Sep/2016 4:31:23 PM
Works are on the go at 5th and 6th railway tracks between Chennai Central and Basin Bridge. As these works are at the verge of completion, there are complete changeover in electric train services.
 
Cancellation of trains
All trains from Chennai Moore Market Complex railway station to Aavadi, Thiruvallur, Arakkonam, Pattabiram, military quarters, and Thiruthani are cacelled between 13th (tomorrow) and 18th of this month. Likewise, trains from Moore Market to Gummudipoondi, and Sullurpet trains are cancelled between 13th and 26th for about 14 long days.
 
Special trains
Special trains are functional in these routes instead. Below are details of departure time and others
 
Tomorrow – Train between Moore market and Aavadi at 09.35 am
Moore market and Thiruvallur at 04.10 am and 05.10 am, 08.00 am, 09.00 am, 10.45 am, noon 12.00 pm, 12.30 pm, 02.20 pm, evening 04.05 pm, 05.50 pm, night 09.25 pm, 10.35 pm, 10.50 pm. A total of 13 trains are functional between these places.
 
Train between Moore market and Arakkonam – 04.50 am, 06.10 am, 07.30 am, 08.35 am, 11.25 am, noon 1.10 pm, 02.55 pm, 04.40 pm, 07.35 pm, 08.50 pm, 10.00 pm.
 
Train between Moore market and Thiruthani – 05.40 am, 06.50 am, 10.10 am, 01.45 pm, 03.30 pm, 05.15 pm, 06.25 pm, 07.00 pm, and 08.15 pm.
 
Train between Aavadi and Moore market – 03.40 am, and 04.00 am.
Train between Thiruvallur and Moore market – 04.00 am, 05.45 am, 06.20 am, 08.35 am, 09.40 am, 11.30 am, 01.15 pm, 03.35 pm, 06.35 pm and 08.55 pm.
 
Between 13th and 18th of this month, there is no direct train between Moore market and Pattabiram. Instead, a train will be functional for every one hour from Aavadi. This train will not stop at Hindu college railway station.
 
Arakkonam – Thirupathi
Between 13th and 26th of this month, train between Moore market and Arakkonam, instead of hailing from the market, will start from Chennai beach at 05.45 pm. Instead of starting from Moore market, the Thirupathi train will start from Chennai beach on 13th, 17th and 18th of this month, and the same will start from Moore market between 14th and 16th of this month.
 
Special trains will be functional between Aavadi and Moore market at 03.45 am, 04.30 am, 05.20 am, 06.15 am and 06.05 am.
 
Trains between Thiruvallur and Moore market will be available at 04.30 am, 05.00 am, 06.50 am, 08.20 am, 08.50 am, 11.20 am, 12.20 pm, 01.20 pm, 02.40 pm, 04.15 pm, 05.50 pm, 07.30 pm amd 09.00 pm.
 
Train between Arakkonam and Moore market will be available at 04.50 am, 06.45 am, 08.00 am (starting from Vellore), 08.45 am, 09.45 am, 10.45 am, 12.15 pm, 01.15 pm, 02.20 pm, 03.30 pm, 05.05 pm, 07.45 pm, and 08.15 pm.
 
Train between Thiruthani and Moore market will be functional at 04.55 am, 05.40 am, 06.40 am, 07.00 am. This will start at Thirupathi at 03.00 pm.
 
Train between Moore market to Chromet and Gummudipoondi will be cancelled between 13th and 26th of this month. Instead of this, train will be available at basin bridge railway station at 7th platform for every 45 minutes.
 
Basin Bridge – Chrompet
Train between Basinin bridge and Chrompet  will be available at 12.25 am, 05.40 am, 06.25 am, 06.55 am, 07.30 am, 08.50 am, 09.10 am, 09.30 am, 10.40 am, 11.40 am, 01.25 pm, 02.10 pm, 03.00 pm, 04.15 pm, 04.45 pm, 05.15 pm, 06.10 pm, 06.30 pm, 07.45 pm, 08.20 pm, 09.00 pm, 09.45 pm, 10.15 pm, and 10.45 pm.
 
Train between Basin bridge and Sullurpet will function at 04.30 am, 05.30 am, 08.00 am, 08.35 am, 10.00 am, 12.45 pm, 03.45 pm, 05.40 pm, 07.00 pm, 08.45 pm.
 
Train between Gummudipoondi and Basin Bridge will be available at 02.45 am, 03.30 am, 04.00 am, 04.55 am, 05.20 am, 06.25 am, 07.05 aChangeover in electric train services
 
Works are on the go at 5th and 6th railway tracks between Chennai Central and Basin Bridge. As these works are at the verge of completion, there are complete changeover in electric train services.
 
Cancellation of trains
All trains from Chennai Moore Market Complex railway station to Aavadi, Thiruvallur, Arakkonam, Pattabiram, military quarters, and Thiruthani are cacelled between 13th (tomorrow) and 18th of this month. Likewise, trains from Moore Market to Gummudipoondi, and Sullurpet trains are cancelled between 13th and 26th for about 14 long days.
 
Special trains
Special trains are functional in these routes instead. Below are details of departure time and others
 
Tomorrow – Train between Moore market and Aavadi at 09.35 am
Moore market and Thiruvallur at 04.10 am and 05.10 am, 08.00 am, 09.00 am, 10.45 am, noon 12.00 pm, 12.30 pm, 02.20 pm, evening 04.05 pm, 05.50 pm, night 09.25 pm, 10.35 pm, 10.50 pm. A total of 13 trains are functional between these places.
 
Train between Moore market and Arakkonam – 04.50 am, 06.10 am, 07.30 am, 08.35 am, 11.25 am, noon 1.10 pm, 02.55 pm, 04.40 pm, 07.35 pm, 08.50 pm, 10.00 pm.
 
Train between Moore market and Thiruthani – 05.40 am, 06.50 am, 10.10 am, 01.45 pm, 03.30 pm, 05.15 pm, 06.25 pm, 07.00 pm, and 08.15 pm.
 
Train between Aavadi and Moore market – 03.40 am, and 04.00 am.
Train between Thiruvallur and Moore market – 04.00 am, 05.45 am, 06.20 am, 08.35 am, 09.40 am, 11.30 am, 01.15 pm, 03.35 pm, 06.35 pm and 08.55 pm.
 
Between 13th and 18th of this month, there is no direct train between Moore market and Pattabiram. Instead, a train will be functional for every one hour from Aavadi. This train will not stop at Hindu college railway station.
 
Arakkonam – Thirupathi
Between 13th and 26th of this month, train between Moore market and Arakkonam, instead of hailing from the market, will start from Chennai beach at 05.45 pm. Instead of starting from Moore market, the Thirupathi train will start from Chennai beach on 13th, 17th and 18th of this month, and the same will start from Moore market between 14th and 16th of this month.
 
Special trains will be functional between Aavadi and Moore market at 03.45 am, 04.30 am, 05.20 am, 06.15 am and 06.05 am.
 
Trains between Thiruvallur and Moore market will be available at 04.30 am, 05.00 am, 06.50 am, 08.20 am, 08.50 am, 11.20 am, 12.20 pm, 01.20 pm, 02.40 pm, 04.15 pm, 05.50 pm, 07.30 pm amd 09.00 pm.
 
Train betwtween Arakkonam and Moore market will be available at 04.50 am, 06.45 am, 08.00 am (starting from Vellore), 08.45 am, 09.45 am, 10.45 am, 12.15 pm, 01.15 pm, 02.20 pm, 03.30 pm, 05.05 pm, 07.45 pm, and 08.15 pm.
 
Train between Thiruthani and Moore market will be functional at 04.55 am, 05.40 am, 06.40 am, 07.00 am. This will start at Thirupathi at 03.00 pm.
 
Train between Moore market to Chromet and Gummudipoondi will be cancelled between 13th and 26th of this month. Instead of this, train will be available at basin bridge railway station at 7th platform for every 45 minutes.
 
Basin Bridge – Chrompet
Train between Basin bridge and Chrompet  will be available at 12.25 am, 05.40 am, 06.25 am, 06.55 am, 07.30 am, 08.50 am, 09.10 am, 09.30 am, 10.40 am, 11.40 am, 01.25 pm, 02.10 pm, 03.00 pm, 04.15 pm, 04.45 pm, 05.15 pm, 06.10 pm, 06.30 pm, 07.45 pm, 08.20 pm, 09.00 pm, 09.45 pm, 10.15 pm, and 10.45 pm.
 
Train between Basin bridge and Sullurpet will function at 04.30 am, 05.30 am, 08.00 am, 08.35 am, 10.00 am, 12.45 pm, 03.45 pm, 05.40 pm, 07.00 pm, 08.45 pm.
 
Train between Gummudipoondi and Basin Bridge will be available at 02.45 am, 03.30 am, 04.00 am, 04.55 am, 05.20 am, 06.25 am, 07.05 am, 07.20 am, 07.55 am, 08.10 am, 08.25 am, 08.55 am, 09.10 am, 09.50 am, 10.50 am, 11.50 am, 12.30 pm, 12.35 pm, 01.35 pm, 02.00 pm, 02.45 pm, 03.15 pm, 03.40 pm, 04.00 pm, 04.30 pm, 05.00 pm, 05.30 pm, 06.00 pm, 06.10pm, 06.45 pm, 07.00 pm, 07.15 pm, 07.30 pm, 08.10 pm, 08.35 pm, 09.40 pm, and 10.05 pm.
 
Train between Chrompet and Nellore will be functional from Aavadi between 13th and 16th, and 19th and 26th of this month.m, 07.20 am, 07.55 am, 08.10 am, 08.25 am, 08.55 am, 09.10 am, 09.50 am, 10.50 am, 11.50 am, 12.30 pm, 12.35 pm, 01.35 pm, 02.00 pm, 02.45 pm, 03.15 pm, 03.40 pm, 04.00 pm, 04.30 pm, 05.00 pm, 05.30 pm, 06.00 pm, 06.10pm, 06.45 pm, 07.00 pm, 07.15 pm, 07.30 pm, 08.10 pm, 08.35 pm, 09.40 pm, and 10.05 pm.
 
Train between Chrompet and Nellore will be functional from Aavadi between 13th and 16th, and 19th and 26th of this month.