Power supply would be suspended in parts of Chennai between 9 am and 2 pm on Thursday (20.08.2020). The power supply will be resumed before 2 pm if the works are completed.
Nolambur:
NNS, HIG, MIG, Chinna Nolambur, Mogappair a part, Mohanaram Nagar, Jaswanth Nagar, Reddy Palayam, Ponniamman Nagar, Keel ayanambakkam, JJ Nagar/West, Nolambur, Adayalampet area etc.,
Kottivakkam:
Areas around Thiruvalluvar nagar, Kottivakkam kuppam, AGS colony, East, West, North, South mada street, Kandhasamy nagar, Bharathidhasan nagar, VGP avenue, Muthumariamman koil st.
Besant Nagar:
16 th Cross street to 28 th cross st, Besant Nagar, 4 th main road, 3 rd main road, 6 th & 7 th Avenue, Veilankanni Church Besent nagar, Odaikuppam, Thidir nagar, Odaiman nagar, Paindiamman koil st.
Palavakkam:
Kazura Garden full area, Renga Reddy Garden full part, M.G.R Salai full part, Sivasamy avenue, Tagore street.
Velachery:
Entire Dhandeeswaram nagar.
Tharamani:
Nehru street part, Pillayarkoil street part, Thiruvalluvar st, Kalikundram Pillayarkoil st, Periyar st, Anna st, Kanagam.
Avadi Thirumullaivoyal:
Siva Sankarapuram, MGR nagar, Anna nagar, Jak nagar, Moorthy nagar, Shanthipuram, CTH road (Avadi to Chennai right side area), Manikandapuram, Balaji nagar, Kalaignar nagar.