Metro train is planned to run amidst the koyambedu and Parangi Malai in the middle of next year. The labors are working day and night to complete the work. The Metro train work is subdivided into two plans: High-level track and Subway track.Two new Railway stations are commencing in Allandur. The high level track and the sub-way track are getting connected in the Allandur railway station. Hence a prime railway station is opened of about Rs.20 Crore. The Metro Train track for the route of VannaraPettai and Airport is build up at a height of 11 metre for first site. Another train Track for the route of Central, Koyambedu and Parangi Malai is build up with the height of 23 metres for the second site. Since there is over population in this railway station, all these amenities are created.
A prime iron bridge is build up in the Metro Train station near Guindy Railway station. The iron track in the iron bridge, is apt for the metro train to cross the railway station. The work for this iron bridge is commencing in Kancheepuram. The work is divided into 3 terms and the bridge is designed using high latest technologies. These designed iron rods are transported from Kancheepuram to Guindy Railway station via lorry trucks. This high featured track is designed in such a way it is highly welcomed by the people. The iron bridge is designed in a square shape. The officers stated that this bridge will be getting fit in the Guindy railway station soon.