Kumari Palany & Co

Power Shutdown areas in Chennai - Saturday (05.10.2024)

Posted on: 04/Oct/2024 9:30:48 AM

Power supply will be suspended in the following areas on Saturday (05.10.2024) from 09.00 am to 02.00 pm for maintenance work.

Guindy: Labour Colony, Guindy Industrial Estate, T.S, Mini T.S, Balaji Nagar, Nagireddy thottam, Part of Ekkattuthangal, Part of Gandhi Nagar Main Road, Sardar Colony, J.N.Salai, Kalaimagal Nagar, Achuthan Nagar 1st Main Road, Arulayampettai, Part of South Phase, Part of Muthuraman Street, Ganapathy Colony, North Phase Tiny Sector, Lazar Street, 3rd Phase Guindy and its Surrounding Areas.

Taramani: Part of MGR Salai, Santhiappan Salai, Kothandaraman Street, Perungudi Kallukuttai area, Part of OMR, Kamarajar Nagar, Kurinji Nagar, Anna Nedunjsalai, Nehru Nagar Kottivakkam area, Srinivasa Nagar, Jayendra Colony, Thiruvalluvar Street, Karpaga Vinayagar Street, Telephone Nagar, Chruch Road, CBI Colony.

Anna Nagar West: J Block, Vaigai Colony, 13th Main Road, Vallalar Kudieruppu, Thangam Colony, 17th Main Road, Thiruvalluvar Kudieruppu, Thirumoolar Colony, 18th Main Road, Malar Colony, Kambar Colony, 19th Main Road, Thendral Colony, 15th Main Road, H Block, 11th Main Road, AP Flat, C Sector, W Block, Imayam Colony, Kailash Colony. 

Ponneri: Devampattu, Agaram, Pallipalayam, Seganiyam, Raakkampalayam, Poongulam & Kallur Village.

Redhills: JJ Nagar, RR Kuppam, Thirthangaraipattu, Sothupakkam Road.

Supply will be resumed before 02.00 P.M, if the works are completed.