Kumari Palany & Co

Power shutdown areas in Chennai on 08-09-16

Posted on: 06/Sep/2016 4:13:32 PM
Power supply will be suspended in the following areas on 08-09-16 between 9.00 A.M. to 2.00 P.M. for maintenance work.Supply will be resumed before 2.00 P.M. if the works are completed.

VILLIVAKKAM AREA : Ponnankinarur st, Bajanai koil st, Chennai Battai st,Narayanan maistri st, Ambedkar st part, Narayanan maistri st, Ambedkar stpart, Thiru.Vi.Ka st, Ragiv Gandhi nagar, Thanthoniamman koil st, Southmada st, East mada st, Thiruvalluvar st, Nageswara colony, Mannadi OthaVaddai st part, Mannadi park st.
PALLAVARAM AREA : Old Pallavaram, Zamin Pallavaram, Thirusulam, Rajajinagar, Mallika Nagar, Subham nagar, Malaganadhapuram, Perumal nagar, partof Krishna nagar,  P.V.V.road, Dharga road, Bharathy nagar, CantonmentPallavaram, GST road Pallavaram, Muthamil nagar, Moongil Eri, Bhavaninagar, Part of Pammal.
PERIYAR NAGAR AREA : Periyar nagar 14th, 16th st, 18th(1st,2nd,3rd cross),19th 21st st, GKM colony (24,24A,25,26,27th st) Muthukumarappa st (full)Anna st, Pillayar koil st.
LAKSHMIPURAM  AREA: Vettri nagar, Golden nagar, Ganesh nagar, Sakthi nagar, Janakiram nagar, Thangavel nagar, Jayalakshmi nagar, Dhanalakshmi nagar, PDot G Appartment, Kamaraj nagar, Bharath nagar, Kadappa road (part), Subashnagar, Singaravelan nagar, Santhosh nagar, Sarathiy nagar, Ganapathy nagar(Cannal road), Annai Indra nagar.
SEMBIUM AREA : Kakkanji colony & nagar, Karunanithi nagar, MPPM st, Ammankovil st, Asiriyar st, Muthu Kumarsamy st, PB road, Balamurugan st,Kasthuri Bai Gandhi nagar, Puzhal Sivagnanam st, Muthu Mariamman koil st,Chinnaiay new colony, Kamaraj nagar, Sriram nagar, Subramani st.
SIDCO NAGAR AREA : Sidco nagar 1 to 9th blocks, South Jaganatha nagar,Nehru nagar.